43 lines
1.8 KiB
Markdown
43 lines
1.8 KiB
Markdown
# AI Capability Is Changing Slope
|
|
|
|
**Derivative ID:** `fm-derivative-8018-slide-001`
|
|
|
|
**Source signal:** [fm-signal-8018](../../signals/fm-signal-8018.md)
|
|
|
|
**Artifact:** presentation-slide · presentation
|
|
|
|
**Review:** draft
|
|
|
|
**Lineage:** current
|
|
|
|
## Draft
|
|
|
|
# AI Capability Is Changing Slope
|
|
|
|
- Epoch Capabilities Index: **~90% acceleration** around April 2024
|
|
- METR task horizon: **~40% acceleration** around October 2024
|
|
- Different measures, same directional warning
|
|
|
|
**Limit:** faster benchmarks do not guarantee persistent or uniform workplace impact.
|
|
|
|
**Decision:** Replace annual assumptions with quarterly task tests.
|
|
|
|
**Learn more:** Tipping Points — Pace of Change.
|
|
|
|
## Call to action
|
|
|
|
Test reliable completion, duration, cost, and failure modes quarterly.
|
|
|
|
## Connected Future Map context
|
|
|
|
- [Tipping Points — Pace of Change (supports)](https://projects.eddiesoehnel.com/adminprojects/future-map-OPEN/src/branch/main/core-docs/Tipping_Points.md#pace-of-change)
|
|
|
|
## Claims used
|
|
|
|
- Epoch AI reports that the best Epoch Capabilities Index score grew almost twice as fast over the latest two-year period, corresponding to a 90% acceleration around April 2024. _(reported-fact; high confidence)_
|
|
- Epoch AI reports a consistent roughly 40% acceleration in METR's time-horizon benchmark around October 2024. _(reported-fact; high confidence)_
|
|
- Two different capability measures pointing in the same direction strengthen the case for shorter planning cycles but do not prove that acceleration will persist. _(interpretation; medium confidence)_
|
|
- Organizations should test capability changes on representative work and update plans from measured triggers rather than a fixed annual curve. _(recommendation; high confidence)_
|
|
|
|
[Structured derivative](fm-derivative-8018-slide-001.json)
|