## Source observation
|
|
|
|
Copper can't be mined fast enough to electrify.
|
|
|
|
We have two twin challenges: (1) just keeping up with electricity needs; (2) transitioning to green.
|
|
|
|
The authors estimate just to keep up - forget transitioning to green infrastructure - the world will need to mine 115% more copper than has been mined in all of human history up until 2018. Our future is one of resource constraints, unlike the recent past where from 1945 till about 2015, we had an era of abundance and got just about anything we wanted, when we wanted it. We will have to make decisions about what we want to do with the resources we have.
|
|
|
|
However, the problem according to the authors appears to be the permitting process to bring on new mines, which takes average of 20-years. We have the know how, tech and resources, we just need to speed up the process.
|
|
|
|
https://www.sciencedaily.com/releases/2024/05/240515164309.htm
|
|
|
|
## Future Map analysis
|
|
|
|
The record reports that copper can't be mined fast enough to electrify. We have two twin challenges: (1) just keeping up with electricity needs; (2) transitioning to green. In the Future Map corpus, energy generation, storage, transmission, and equipment are enabling layers for AI, manufacturing, electrification, and resilience, so physical capacity and grid connection often determine the pace of downstream growth. This record should therefore be treated as a directional signal and connected to operating indicators before it is used as a stand-alone forecast.
|
|
|
|
## Implications
|
|
|
|
- Track operating capacity, interconnection, equipment lead times, and delivered cost rather than announced capacity alone.
|
|
- Prioritize bottlenecks whose removal unlocks several downstream sectors or improves local resilience.
|
|
|
|
## Classification
|
|
|
|
- **Signal types:** bottleneck, structural-shift
|
|
- **Topics:** energy
|
|
- **Future Map concepts:** growth-engine, distributed-infrastructure, resource-constraint
|
|
- **Time horizons:** near-term, medium-term
|
|
- **Direction:** positive
|
|
- **Maturity:** accelerating
|
|
- **Confidence:** medium
|
|
|
|
## Connected Future Map context
|
|
|
|
- [Core section: Reindustrialization Supplement — Energy Is Basis For Everything (illustrates)](../../../core-docs/Reindustrialization-Supplement.md#energy-is-basis-for-everything)
|
|
- [Core section: Skills and Jobs of a Future with AI Dominating — 7. Infrastructure & Energy “Backbones” (illustrates)](../../../core-docs/Skills-And-Jobs-Of-A-Future-With-AI-Dominating.md#7-infrastructure--energy-backbones)
|
|
- [Related signal: Future Map Signal 5196 (illustrates)](fm-signal-5196.md)
|
|
|
|
## Source links
|
|
|
|
- [https://www.sciencedaily.com/releases/2024/05/240515164309.htm](https://www.sciencedaily.com/releases/2024/05/240515164309.htm)
|
|
|
|
[Authoritative structured record](../hrecords/4282.json)
|