Files
future-map-OPEN/data/insights-hub/hrecords/5997.json
T
2026-08-21 13:31:32 -06:00

191 lines
7.0 KiB
JSON
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
{
"schema_version": "1.2",
"id": "fm-signal-5997",
"source_record": {
"source_file_id": "5997",
"hub_id": "5997",
"date": "2026-06-24",
"date_original": "06/24/2026",
"title": "Why American data centers can’t plug in",
"summary": "Great article on our power issues withj respect to the AI buildout. We have enough power that can be installed, we just can't plug in projects (both power generation and data centers) because of the backlog in the connection queue, which stands at 55 months at present. Connecting to our grid requires careful analysis, taking time. Not covered in this article are issues with our old grid, which required upgrades and the backlog in equipment required to do it, not to mention cost. Or, if possible install solar and batteries at the household level, which shifts costs and burden to consumers and is not feasible for most. We will have to struggle through all this as best as we can, but costs will go up and reliability may go down. https://worksinprogress.co/issue/why-american-data-centers-cant-plug-in",
"capture_schema_version": "legacy",
"capture_type": "legacy",
"capture_context": {
"present": false,
"content_type": "none",
"text": null,
"used_for_reasoning": false
},
"intended_use": [],
"publication_restriction_present": false,
"notes": {
"present": false,
"content_type": "none",
"text": null,
"used_for_reasoning": false
},
"hub_tags": [
"External Platform Posts",
"Future Map"
],
"companies": [],
"contact_reference_count": 2
},
"source": {
"title": null,
"publisher": null,
"author": null,
"publication_date": "2026-06-24",
"canonical_url": "https://worksinprogress.co/issue/why-american-data-centers-cant-plug-in",
"access": "unknown"
},
"links": [
{
"url": "https://worksinprogress.co/issue/why-american-data-centers-cant-plug-in",
"title": null,
"kind": "source",
"source_field": "Summary"
}
],
"media": [
{
"id": "fm-media-5997-1",
"media_type": "document",
"source_field": "File",
"source_reference": "america_power_why_cant_plug_data_centers.pdf",
"public_path": "files/america_power_why_cant_plug_data_centers.pdf",
"source_url": null,
"content_hash": "sha256:fb585869f9d86bc92eb264774d95bdc9ffb386c592342b743009e7d835f0db9a",
"copy_status": "copied",
"rights_status": "unknown",
"publication_decision": "publish",
"description": "Inspected document artifact connected to 'Why American data centers can’t plug in'.",
"extracted_text": "The rendered article identifies grid interconnection queues and transmission access, rather than total electricity supply alone, as the principal data-center bottleneck.",
"inspection": {
"requirement": "required",
"status": "inspected",
"method": "multimodal",
"inspected_at": "2026-08-20T20:16:42Z",
"inspected_by": "codex-gpt5-sol-medium"
}
}
],
"source_assessment": {
"status": "sufficient",
"basis": [
"summary",
"source-url",
"connected-media"
],
"missing_elements": [],
"assessment": "The source-authored context and inspected connected artifact provide enough evidence for bounded corpus enrichment.",
"assessed_by": "codex-gpt5-sol-medium",
"assessed_at": "2026-08-20T20:16:42Z",
"review_required": false
},
"rights": {
"ownership": "unknown",
"rights_status": "unknown",
"source_access": "unknown",
"publication_policy": "publish-with-attribution",
"publication_decision": "publish",
"approved_by": "repository-owner",
"attribution": null
},
"reasoning": {
"status": "complete",
"analysis": "The record reports that great article on our power issues withj respect to the AI buildout. In the Future Map corpus, the buildout of productive capacity is a prospective growth engine, but power, capital, permitting, supply-chain, and execution constraints determine how much announced investment becomes durable output. This record should therefore be treated as a directional signal and connected to operating indicators before it is used as a stand-alone forecast.",
"implications": [
"Distinguish announced spending from connected, operating, and economically productive capacity.",
"Prioritize enabling infrastructure and bottleneck removal because these unlock several downstream industries at once."
],
"claims": [
{
"text": "Great article on our power issues withj respect to the AI buildout.",
"type": "reported-fact",
"confidence": "high"
},
{
"text": "the buildout of productive capacity is a prospective growth engine, but power, capital, permitting, supply-chain, and execution constraints determine how much announced investment becomes durable output.",
"type": "interpretation",
"confidence": "medium"
}
],
"classification": {
"signal_types": [
"structural-shift",
"bottleneck"
],
"topics": [
"reindustrialization"
],
"future_map_concepts": [
"reindustrialization",
"growth-engine",
"resource-constraint"
],
"time_horizons": [
"near-term",
"medium-term"
],
"geographies": [
"Global"
],
"industries": [],
"audiences": [
"individuals",
"business-leaders",
"investors",
"policymakers"
],
"direction": "positive",
"maturity": "accelerating"
},
"related_documents": [
{
"document_id": "future-growth-engines-us",
"section_id": "the-single-core-problem-facing-the-u-s-that-drives-all-other-challenges",
"relationship": "illustrates",
"relevance": 0.9,
"review_status": "machine-proposed"
},
{
"document_id": "reindustrialization-supplement",
"section_id": "conclusion",
"relationship": "illustrates",
"relevance": 0.82,
"review_status": "machine-proposed"
}
],
"related_signals": [
{
"signal_id": "fm-signal-7062",
"relationship": "illustrates",
"relevance": 0.78,
"review_status": "machine-proposed"
}
],
"confidence": "high",
"novelty": "reinforcing",
"corpus_documents_consulted": [
"future-growth-engines-us",
"reindustrialization-supplement"
],
"generated_at": "2026-08-20T20:17:24Z",
"generated_by": "codex-gpt5-sol-medium"
},
"review": {
"publication_status": "approved",
"content_review": "automated",
"privacy_review": "automated-passed",
"rights_review": "owner-risk-accepted",
"warnings": []
},
"provenance": {
"source_hash": "sha256:3e2e8fca5f0b14afeff04c03b8822f33451e99fd62535737e161060edc55440b",
"input_fingerprint": "sha256:fe65ba56994fff5936e85916cd49fcd8684f70361b2f48a565d13d19c30ed072",
"pipeline_version": "1.4.0",
"prepared_at": "2026-08-21T19:15:10Z"
}
}