# AI Growth Must Be Built
**Derivative ID:** `fm-derivative-8020-slide-001`
**Source signal:** [fm-signal-8020](../../signals/fm-signal-8020.md)
**Artifact:** presentation-slide · presentation
**Review:** draft
**Lineage:** stale
## Draft
# AI Growth Must Be Built
**Digital demand depends on physical systems:**
- Power + grid connections
- Cooling + facilities
- Equipment + construction
- Permits + skilled operators
**Opportunity:** Serve one hard bottleneck in the supply chain.
**Evidence gate:** contracted power, permits, equipment, financing, customers, community terms.
**Learn more:** Reindustrialization Supplement — Energy Is Basis For Everything.
## Call to action
Select one infrastructure bottleneck and validate the evidence gate.
## Connected Future Map context
- [Reindustrialization Supplement — Energy Is Basis For Everything (supports)](https://projects.eddiesoehnel.com/adminprojects/future-map-OPEN/src/branch/main/core-docs/Reindustrialization-Supplement.md#energy-is-basis-for-everything)
## Claims used
- The inspected screenshot says legacy systems cannot handle what is coming across AI, energy, and infrastructure and calls for a large physical-world buildout. _(reported-fact; high confidence)_
- AI capacity expansion depends on physical inputs and systems including energy, facilities, cooling, grid connections, equipment, and skilled labor. _(interpretation; medium confidence)_
- The screenshot does not quantify the buildout or establish a project timeline, technology mix, or regional demand forecast. _(interpretation; high confidence)_
- Decision-makers should validate projects through contracted power, permits, equipment availability, cost allocation, and community terms. _(recommendation; high confidence)_