2.1 KiB
2.1 KiB
Repository structure implementation receipt
- Date: 2026-10-14 (America/Denver).
- Approved plan: structure-ai-ready-repository, revision 1; owner replied "approved".
- Outcome: implemented local skill-workflow discovery structure, repository release 1.1.0.
- Identity: Eddie Soehnel as author, publisher and maintainer; MIT preserved; canonical URL verified from local Git origin.
- Metadata: repository manifest, stable variables, content catalog, citation, attribution, version and lifecycle files.
- Entry points: expanded README, AGENTS and skills index; contribution/security guidance; script guide and synthetic provenance example.
- Validation support: template audit and three unchanged template schemas, deterministic index builder, discovery validator and six regression tests.
- Automatic maintenance: rollup now refreshes content-index.json; automation prompt updated to authorize only this additional deterministic write. Active Monday 07:00 Denver schedule and destination thread preserved.
- Preservation: original archive hash unchanged, 17 weekly sections; reports, original framework, license, templates and evaluations retained.
- Incidental correction: fixed report-template link from the research skill; within approved entrypoint/link validation scope.
- Git: no commit, push, branch, remote, publication, release or server changes. All original pack files were untracked at baseline; diff --check covers tracked diffs only, so file validation and readback supply additional checks.
- Capture: manual partial implementation evidence; costs/tokens unavailable. Public catalogs exclude local receipts and task records.
- Rollback: retain historical reports and original framework. To roll back indexing, review removal of the rollup index hook and automation prompt exception together; do not delete source reports. Metadata changes require reviewed owner authority.
- Limitations: full JSON Schema and generic Codex skill validator could not run due to absent jsonschema/PyYAML. Remote hosting/search ingestion and first full scheduled research run not observed.
See validation results. No material departure from approved plan revision 1.