# AI Growth Must Be Built **Derivative ID:** `fm-derivative-8020-slide-001` **Source signal:** [fm-signal-8020](../../signals/fm-signal-8020.md) **Artifact:** presentation-slide · presentation **Review:** draft **Lineage:** current ## Draft # AI Growth Must Be Built **Digital demand depends on physical systems:** - Power + grid connections - Cooling + facilities - Equipment + construction - Permits + skilled operators **Opportunity:** Serve one hard bottleneck in the supply chain. **Evidence gate:** contracted power, permits, equipment, financing, customers, community terms. **Learn more:** Reindustrialization Supplement — Energy Is Basis For Everything. ## Call to action Select one infrastructure bottleneck and validate the evidence gate. ## Connected Future Map context - [Reindustrialization Supplement — Energy Is Basis For Everything (supports)](https://projects.eddiesoehnel.com/adminprojects/future-map-OPEN/src/branch/main/core-docs/Reindustrialization-Supplement.md#energy-is-basis-for-everything) ## Claims used - The inspected screenshot says legacy systems cannot handle what is coming across AI, energy, and infrastructure and calls for a large physical-world buildout. _(reported-fact; high confidence)_ - AI capacity expansion depends on physical inputs and systems including energy, facilities, cooling, grid connections, equipment, and skilled labor. _(interpretation; medium confidence)_ - The screenshot does not quantify the buildout or establish a project timeline, technology mix, or regional demand forecast. _(interpretation; high confidence)_ - Decision-makers should validate projects through contracted power, permits, equipment availability, cost allocation, and community terms. _(recommendation; high confidence)_ [Structured derivative](fm-derivative-8020-slide-001.json)