This commit is contained in:
eddiesoehnel committed 2026-08-12 13:34:45 -06:00
1 parent f5aebfaf77
commit 87cc362513
1541 files changed
+25537 -2

No files matched your search

+12
View File
@@ -0,0 +1,12 @@
{
"HubID": "5997",
"Date": "06/24/2026",
"Title": "Why American data centers can’t plug in",
"HubTags": ["External Platform Posts", "Future Map"],
"Contacts": ["contact1", "contact2"],
"Companies": "",
"File": "america_power_why_cant_plug_data_centers.pdf",
"Image": "",
"Summary": "Great article on our power issues withj respect to the AI buildout. We have enough power that can be installed, we just can't plug in projects (both power generation and data centers) because of the backlog in the connection queue, which stands at 55 months at present. Connecting to our grid requires careful analysis, taking time. Not covered in this article are issues with our old grid, which required upgrades and the backlog in equipment required to do it, not to mention cost. Or, if possible install solar and batteries at the household level, which shifts costs and burden to consumers and is not feasible for most. We will have to struggle through all this as best as we can, but costs will go up and reliability may go down. https://worksinprogress.co/issue/why-american-data-centers-cant-plug-in ",
"Notes": ""
}