added
This commit is contained in:
1 parent
f5aebfaf77
commit
87cc362513
1541 files changed
+25537
-2
No files matched your search
@@ -0,0 +1,15 @@
|
||||
{
|
||||
"HubID": "4990",
|
||||
"Date": "11/25/2024",
|
||||
"HubTags": [
|
||||
"External Platform Posts",
|
||||
"Future Map Forward Guidance",
|
||||
"Future Map"
|
||||
],
|
||||
"Contacts": "",
|
||||
"Companies": "",
|
||||
"File": "",
|
||||
"Image": "4990__Image_URL.jpg",
|
||||
"Summary": "<p>The United States has incredible potential for growth, but several challenges could threaten its trajectory—one of the most critical being resource constraints. </p><p>For decades, U.S. electricity demand grew by less than 1% annually. However, utilities and grid operators have recently doubled their growth forecasts to about 1.5% per year over the next five years—the highest rate since the 1990s, before energy efficiency efforts began to curb demand.</p><p>The reality is that we need to double our electricity production within the next decade, yet we’re 85% short of that target with current forecasts! </p><p>Achieving this requires a massive expansion of energy infrastructure, but resource availability is becoming increasingly strained due to geopolitical tensions and supply chain disruptions. </p><p>Without securing the critical materials and resources necessary for this expansion, we risk falling short of the energy generation needed to power the large-scale reindustrialization essential for our nation’s economic and industrial future.</p>",
|
||||
"Notes": ""
|
||||
}
|
||||
Reference in new issue
Block a user