This commit is contained in:
eddiesoehnel committed 2026-08-12 13:34:45 -06:00
1 parent f5aebfaf77
commit 87cc362513
1541 files changed
+25537 -2

No files matched your search

+13
View File
@@ -0,0 +1,13 @@
{
"HubID": "4356",
"Date": "6/5/2024",
"HubTags": [
"Future Map"
],
"Contacts": "",
"Companies": "",
"File": "",
"Image": "",
"Summary": "<p>Small modular nuclear reactors: a history of failure</p>",
"Notes": "<div class=\"main\" style=\"color:rgb(68, 68, 68);font-size:16px\"><div class=\"section pb-0\"><div class=\"container\" style=\"width:1200px\"><div class=\"row\"><div class=\"col-8 col-lg-4 pl-3 pt-lg-4 pl-half-col pl-lg-half-col\" style=\"width:600px\"><h1 class=\"display-3 pb-2 mt-lg-5\" style=\"font-weight:700;color:rgb(0, 0, 0)\">Small modular nuclear reactors: a history of failure</h1><p class=\"article-meta text-font-size-12 mb-0 mb-lg-5\" style=\"color:rgb(159, 159, 159)\">by <a href=\"https://www.climateandcapitalmedia.com/author/jimgreen/\">Jim Green</a> | Jan 17, 2024</p></div></div></div></div><div class=\"section\"><div class=\"container\" style=\"width:1200px\"><div class=\"row\"><div class=\"col-8 col-lg-2\" style=\"width:300px\"><p class=\"text-color-grey pl-3 mt-0\" style=\"color:rgb(159, 159, 159)\">Share on</p><div class=\"social-icons pl-3 mb-4\"><div class=\"addtoany_shortcode\"><div class=\"a2a_kit a2a_kit_size_22 addtoany_list\"><a class=\"a2a_button_facebook\" href=\"https://www.climateandcapitalmedia.com/#facebook\" title=\"Facebook\" target=\"_blank\"><img src=\"https://cdn-5e846716f911ca0ca0d246fc.closte.com/wp-content/themes/climate-capital/s-icons/facebook.png\" width=\"20\" height=\"22\" alt=\"Facebook\" /></a><a class=\"a2a_button_linkedin\" href=\"https://www.climateandcapitalmedia.com/#linkedin\" title=\"LinkedIn\" target=\"_blank\"><img src=\"https://cdn-5e846716f911ca0ca0d246fc.closte.com/wp-content/themes/climate-capital/s-icons/linkedin.png\" width=\"20\" height=\"22\" alt=\"LinkedIn\" /></a><a class=\"a2a_button_twitter\" href=\"https://www.climateandcapitalmedia.com/#twitter\" title=\"Twitter\" target=\"_blank\"><img src=\"https://cdn-5e846716f911ca0ca0d246fc.closte.com/wp-content/themes/climate-capital/s-icons/twitter.png\" width=\"20\" height=\"22\" alt=\"Twitter\" /></a><a class=\"a2a_button_email\" href=\"https://www.climateandcapitalmedia.com/#email\" title=\"Email\" target=\"_blank\"><img src=\"https://cdn-5e846716f911ca0ca0d246fc.closte.com/wp-content/themes/climate-capital/s-icons/email.png\" width=\"20\" height=\"22\" alt=\"Email\" /></a></div></div></div></div><div class=\"col-8 col-lg-4 mt-lg-n4 pr-0\" style=\"width:600px\"><div class=\"article-content-wrap pt-4 pb-5 pl-3 pr-3 text-font-size-16\"><h4 style=\"font-weight:700;color:rgb(0, 0, 0)\">Global hype around small reactor designs to replace fossil fuels is on the rise everywhere but few, if any, are likely to ever be built. </h4><p style=\"font-size:1rem\">Small modular reactors (SMRs) have been the subject of endless hype in recent years but in fact, no SMRs have ever been built, none are being built now and in all likelihood none will ever be built because of the prohibitive costs.</p><p style=\"font-size:1rem\">SMRs are defined as reactors with a capacity of 300 megawatts (MW) or less with serial factory production of reactor components (or ‘modules’). No SMRs have been built, but dozens of small (<300 MW) power reactors have been built in numerous countries, without factory production of reactor components.</p><p style=\"font-size:1rem\">Before looking at the troubled history of small reactors, it’s important to note the context for the explosion in SMR hype. The hype for new types of reactors is largely a result of the stunning failure of conventional reactor construction projects.</p><p style=\"font-size:1rem\">In the U.S., the only current reactor construction project is the Vogtle project in Georgia (two AP1000 reactors). The latest <a target=\"_blank\" href=\"https://www.worldnuclearreport.org/The-World-Nuclear-Industry-Status-Report-2022-HTML.html#_idTextAnchor086\">cost estimate</a> of $34 billion is more than double the estimate when construction began – $14-15.5 billion.</p><p style=\"font-size:1rem\">The V.C. Summer project in South Carolina (two AP1000 reactors) was <a target=\"_blank\" href=\"https://www.worldnuclearreport.org/Toshiba-Westinghouse-The-End-of-New-build-for-the-Largest-Historic-Nuclear.html\">abandoned</a> in 2017 after the expenditure of around $9 billion. U.S. nuclear giant Westinghouse filed for bankruptcy shortly after the abandonment of the South Carolina project, and its parent company Toshiba only survived by selling off its most profitable assets.</p><p style=\"font-size:1rem\">In 2006, Westinghouse said it could build an AP1000 reactor for as little as <a target=\"_blank\" href=\"https://www.nytimes.com/2006/07/16/magazine/16nuclear.html\">$1.4 billion</a>, 12 times lower than the current estimate for Vogtle.</p><blockquote style=\"font-weight:700;color:rgb(103, 194, 145)\"><p>Add a zero to industry estimates and your estimate will be far closer to the mark than theirs</p></blockquote><p style=\"font-size:1rem\">In the late 2000s, the estimated construction cost for one EPR reactor in the U.K. was <a target=\"_blank\" href=\"https://energypost.eu/saga-hinkley-point-c-europes-key-nuclear-decision/\">£2 billion</a> (US$2.52 billion). The currentLine truncated
}