added
This commit is contained in:
1 parent
f5aebfaf77
commit
87cc362513
1541 files changed
+25537
-2
No files matched your search
@@ -0,0 +1,13 @@
|
||||
{
|
||||
"HubID": "4314",
|
||||
"Date": "5/25/2024",
|
||||
"HubTags": [
|
||||
"Future Map"
|
||||
],
|
||||
"Contacts": "",
|
||||
"Companies": "",
|
||||
"File": "",
|
||||
"Image": "",
|
||||
"Summary": "The outdated power grid is nearing a crisis point. Here’s how to prevent it<p><a href=\"https://www.fastcompany.com/91129900/the-outdated-power-grid-is-nearing-a-crisis-point-heres-how-to-prevent-it?s=03\" target=\"_blank\">https://www.fastcompany.com/91129900/the-outdated-power-grid-is-nearing-a-crisis-point-heres-how-to-prevent-it?s=03</a></p>",
|
||||
"Notes": "<p>05-23-2024</p><p>IMPACT</p><p><br /></p><p>The outdated power grid is nearing a crisis point. Here’s how to prevent it</p><p>New transmission lines take years to build, and that’s slowing down renewable energy projects. But technology can help make better use of existing infrastructure now.</p><p><br /></p><p>The outdated power grid is nearing a crisis point. Here’s how to prevent it</p><p>[Source Photo: Getty Images]</p><p><br /></p><p><br /></p><p>BY ADELE PETERS</p><p>6 MINUTE READ</p><p><br /></p><p>More than 10,000 proposed solar, wind, and battery projects are currently waiting in line to connect to the U.S. electric grid—more than enough to hit a target of 90% clean energy by 2035. But many of the projects won’t get built, in part because the grid doesn’t have enough capacity to handle the new power. Getting the permits to build a new transmission line can take as long as 15 years.</p><p><br /></p><p>As electricity demand surges because of AI, cryptocurrency, and electric vehicles, the problem is getting even more urgent. Permitting reform will help make it easier to build new power lines. But there are also faster ways to boost the grid’s capacity now.</p><p><br /></p><p>NEW STATE-OF-THE-ART POWER LINES</p><p>One fix: Instead of building new transmission lines, just swapping out old power lines (and reusing old towers) can boost the grid. A recent report estimated that replacing existing power lines with advanced equipment could double the grid’s capacity in many parts of the country. Instead of the five to 15 years it would take to build a new transmission line, changing an old line can take as little as 18 months, and cost half as much. If it happened broadly, it could help quadruple the projected transmission capacity in the U.S. by 2035.</p><p><br /></p><p>“The transmission needs that we’re seeing are pretty astronomical,” says Michelle Solomon, senior policy analyst at Energy Innovation, one of the groups behind the report. “The thing that’s exciting about this technology is that it can significantly increase transmission capacity in a really short period of time.”</p><p><br /></p><p>Standard power lines (or conductors, in industry-speak) are made with aluminum wrapped around a steel core. TS Conductor, one startup in the space, makes conductors with a carbon fiber core that can carry twice as much electricity. The equipment is both stronger and lighter than steel, so it doesn’t sag dangerously when more power flows through.</p><p><br /></p><p>In an installation in Montana, one utility added TS Conductor’s wires when it connected to a new wind farm. Without the technology, it would have had to also replace the towers holding up the power lines; because that didn’t happen, the project was two years faster and cost 40% less. If the utility had needed to build a completely new transmission line, it would have taken even longer.</p><p><br /></p><p>Veir, another startup, is developing superconducting power lines that can deliver 5 to 10 times as much electricity as a standard conductor and can be installed over long distances. The company has validated the tech in pilots and is now finalizing the design. “Right now we’re focused on challenging transmission projects that face significant permitting, siting, or public opposition barriers,” says CEO Tim Heidel. “These barriers can result in delays of many years. [We] can make better use of existing transmission rights of way for upgrades, and require much less land for new builds.”</p><p><br /></p><p><br /></p><p>Advanced conductor technology faces some challenges in adoption, including the fact that utilities are traditionally slow to change. Their business model also gives them an incentive to invest in expensive projects, like building new transmission lines, and then pass the cost on to consumers. But as electricity demand quickly grows, utilities are realizing that they need faster options.</p><p><br /></p><p>Some utilities, like National Grid, now invest in startups like TS Conductor and Veir. “I think the electric grid is viewed almost as a potential Achilles’ heel of net zero achievement,” says Kristian Bodek, director at National Grid’s investment arm. “So there is an increased scrutiny and focus on what we can do as utilities to help facilitate the growth in renewables, as well as all of the increase in demand.” Policies can also help, Solomon says, including state laws that require utilities to consider using tech like advanced conductors or give utilities better incentives to adopt it.</p><p><br /></p><p>SENSORS AND SOFTWARE</p><p>Some utilities are beginning to use sensors on electric towers to track how much power is flowing through lines. There’s usually much more capacity than is being used, but utilities rely on very conservative estimates. “Utilities currently operate with ‘static ratings’ for their transmission lines, which essentially act like a speed liLine truncated
|
||||
}
|
||||
Reference in new issue
Block a user