Showing general office vs data center construction spending. .
## Future Map analysis
The record reports that showing general office vs data center construction spending. In the Future Map corpus, the buildout of productive capacity is a prospective growth engine, but power, capital, permitting, supply-chain, and execution constraints determine how much announced investment becomes durable output. This record should therefore be treated as a directional signal and connected to operating indicators before it is used as a stand-alone forecast.
## Implications
- Distinguish announced spending from connected, operating, and economically productive capacity.
- Prioritize enabling infrastructure and bottleneck removal because these unlock several downstream industries at once.
- [Core section: Future Growth Engines for the U.S. — The Single Core Problem Facing The U.S. That Drives All Other Challenges (illustrates)](../../../core-docs/Future-Growth-Engines-For-The-US-The-One-Starting-Now-That-Unlocks-Americas-Next-Economic-Supercycle.md#the-single-core-problem-facing-the-us-that-drives-all-other-challenges)