92 lines
4.6 KiB
JSON
92 lines
4.6 KiB
JSON
{
|
|||
|
|
"schema_version": "1.0",
|
||
|
|
"id": "fm-derivative-8165-slide-001",
|
||
|
|
"source_signal_id": "fm-signal-8165",
|
||
|
|
"artifact_type": "presentation-slide",
|
||
|
|
"channel": "presentation",
|
||
|
|
"audiences": [
|
||
|
|
"business-leaders",
|
||
|
|
"consumer-brands",
|
||
|
|
"investors",
|
||
|
|
"policymakers"
|
||
|
|
],
|
||
|
|
"objective": "Give leaders a one-slide framework for turning projected copper pressure into resilient electrification decisions.",
|
||
|
|
"title": "Electrification Has a Materials Bottleneck",
|
||
|
|
"content": "# Electrification Has a Materials Bottleneck\n\n- **Signal:** BloombergNEF models copper as the supply exception among ten transition materials, with a deficit beginning in 2028.\n- **Constraint:** Mines, processing, recycling, equipment, and substitution cannot scale instantly.\n- **Boundary:** A copper gap can raise copper-intensive costs, but it does not prove uniform economy-wide inflation.\n- **Decision:** Map copper use, suppliers, lead times, contracts, and substitutes before the bottleneck reaches the project plan.\n- **Options:** Efficiency • recycled copper • diversified supply • alternative designs • recovery • trigger-based inventory\n\n**Action:** Make one copper-intensive program resilient before prices or delivery schedules force the change.",
|
||
|
|
"content_format": "markdown",
|
||
|
|
"call_to_action": "Select one copper-intensive program and assign an owner to complete its exposure and options map.",
|
||
|
|
"claims_used": [
|
||
|
|
{
|
||
|
|
"claim_index": 0,
|
||
|
|
"text": "The BloombergNEF-attributed chart models sufficient long-term supply capacity for nine of ten transition materials and shows copper supply falling below demand beginning in 2028.",
|
||
|
|
"type": "reported-fact",
|
||
|
|
"confidence": "high"
|
||
|
|
},
|
||
|
|
{
|
||
|
|
"claim_index": 1,
|
||
|
|
"text": "BloombergNEF's official Transition Metals Outlook 2026 summary projects a copper shortfall of about 20 million metric tons by 2050, equal to 44% of projected demand, if additional supply is not developed.",
|
||
|
|
"type": "reported-fact",
|
||
|
|
"confidence": "high"
|
||
|
|
},
|
||
|
|
{
|
||
|
|
"claim_index": 3,
|
||
|
|
"text": "A copper supply gap could raise costs and slow copper-intensive deployment, but the available evidence does not establish a uniform or economy-wide inflation pass-through.",
|
||
|
|
"type": "interpretation",
|
||
|
|
"confidence": "medium"
|
||
|
|
},
|
||
|
|
{
|
||
|
|
"claim_index": 4,
|
||
|
|
"text": "Long mine and processing lead times make copper a strategic bottleneck that businesses should address before projected deficits appear in spot prices or delivery schedules.",
|
||
|
|
"type": "interpretation",
|
||
|
|
"confidence": "medium"
|
||
|
|
},
|
||
|
|
{
|
||
|
|
"claim_index": 5,
|
||
|
|
"text": "Businesses with material copper exposure should map usage and suppliers, model price and availability scenarios, and test efficiency, recycling, substitution, contracting, and inventory responses.",
|
||
|
|
"type": "recommendation",
|
||
|
|
"confidence": "high"
|
||
|
|
}
|
||
|
|
],
|
||
|
|
"references": [
|
||
|
|
{
|
||
|
|
"connection_id": "fm-connection-4000b23113ea2c4f8b0f",
|
||
|
|
"target_type": "core-section",
|
||
|
|
"target_id": "reckoning-resurgence-summary#resource-constraints",
|
||
|
|
"relationship": "illustrates",
|
||
|
|
"label": "Reckoning and Resurgence Summary — Resource constraints",
|
||
|
|
"repository_path": "core-docs/Reckoning-And-Resurgence-Summary.md",
|
||
|
|
"url": "https://projects.eddiesoehnel.com/adminprojects/future-map-OPEN/src/branch/main/core-docs/Reckoning-And-Resurgence-Summary.md#resource-constraints"
|
||
|
|
}
|
||
|
|
],
|
||
|
|
"authoring": {
|
||
|
|
"skill": "eddie-voice-writing",
|
||
|
|
"source_repository": "ES-authoring-skills",
|
||
|
|
"source_path": "skills/ES-writing-skill.md",
|
||
|
|
"voice_profile": "eddie-soehnel",
|
||
|
|
"authoring_notes": [
|
||
|
|
"Uses one headline, an evidence signal, an explicit boundary, a decision framework, and a concrete action.",
|
||
|
|
"Primary signal is a materials constraint within the electrification structural shift."
|
||
|
|
],
|
||
|
|
"generated_by": "openai-codex-eddie-voice-writing",
|
||
|
|
"generated_at": "2026-11-12T13:40:17Z"
|
||
|
|
},
|
||
|
|
"review": {
|
||
|
|
"status": "draft",
|
||
|
|
"reviewer": null,
|
||
|
|
"reviewed_at": null,
|
||
|
|
"feedback": null
|
||
|
|
},
|
||
|
|
"publication": {
|
||
|
|
"status": "not-published",
|
||
|
|
"url": null,
|
||
|
|
"published_at": null,
|
||
|
|
"channel": null
|
||
|
|
},
|
||
|
|
"lineage": {
|
||
|
|
"source_record_hash": "sha256:45ecdbcbe443d6eabebb8541d27adac8886b6564f9243f40f25050ef7e5a2509",
|
||
|
|
"source_reasoning_hash": "sha256:855931999ff5403557d8d562434f2eb3da239a745461d864a338e40b7ad4687e",
|
||
|
|
"selected_connections_hash": "sha256:4071c5c08281d4018b2ffe7302ede5181d87a38470d20b3cf6f4cb1bff34ff0d",
|
||
|
|
"authoring_patch_hash": "sha256:d95b3dc996ac6f4300b2bc1bd874ea8c9f5d9a08d3c0e080887a255d6f8fbd92",
|
||
|
|
"supersedes_derivative_id": null
|
||
|
|
}
|
||
|
|
}
|