eddie-soehnel-portable-iden.../skill-receipts/PID-update-run-receipt-2026-06-16.md

212 lines
11 KiB
Markdown
Raw Permalink Normal View History

2026-06-16 18:38:11 +00:00
# PID Update Run Receipt
## Skill Run
- Skill name: pid-update-maintenance
- Skill source/path: `C:\projects\ES\eddie-soehnel-portable-identity-document-OPEN\skills\PID-update-maintenance-skill.md`
- Skill version or file timestamp if known: read and patched on June 16, 2026 to strengthen explicit source authorization requirements.
- Run date: 2026-06-16
- Executor/host: Codex desktop, PowerShell, Google Drive connector.
- User request: Run the PID update maintenance skill for the existing PID covering the last 10 days, with approved sources `C:\Users\edsoe\My Drive` and `C:\projects`.
## Timeframe
June 6, 2026 through June 16, 2026.
## PID Source
`C:\projects\ES\eddie-soehnel-portable-identity-document-OPEN\Eddie-Soehnel-Portable-Identity-Document-Level-1.md`
## PID Format And Edit Method
- Format: Markdown.
- Edit method for this run: review draft only. The PID was not modified because the skill requires user review and approval first.
## Inputs Used
- Current PID: `C:\projects\ES\eddie-soehnel-portable-identity-document-OPEN\Eddie-Soehnel-Portable-Identity-Document-Level-1.md`
- Review draft: `PID-update-review-draft-2026-06-16.md`
- Revised review draft: none yet.
- User-provided instructions: cover the last 10 days; approved sources are `C:\Users\edsoe\My Drive` and `C:\projects`.
- Privacy boundaries: not explicitly stated in the second source list; standard privacy applied.
- Update goals: maintain current PID with recent accomplishments, projects, learnings, proof, needs, offers, and match-context signals.
## Assumptions Made
- "Last 10 days" was interpreted as June 6, 2026 through June 16, 2026.
- Standard privacy means health, family, client, financial, legal, account, credential, private network, and operational-security details should be excluded, generalized, or presented as review questions.
- The PID repo itself is not assumed to be the only source; it was reviewed only because `C:\projects` was explicitly approved and it contained relevant PID work.
- Google Drive `.gdoc`, `.gsheet`, and `.gslides` local files are pointer/stub files; relevant content was fetched through the Google Drive connector when feasible.
## Capabilities Used
- Filesystem: read approved source roots; created local draft and receipt.
- Connectors: Google Drive search with best-effort fetch for selected docs.
- Browser/network: none.
- Subagents: none.
- Document/PDF/spreadsheet tools: no dedicated PDF rendering; PDF titles and selected Drive-fetched content were used where available, but most PDFs were not deeply extracted.
## Tool Calls Or Commands Executed
- Read skill file.
- Read current PID.
- Listed PID repo contents.
- Extracted PID headings.
- Patched PID skill to require explicit source listings and not assume PID repo as source.
- Inventoried recently modified files under `C:\Users\edsoe\My Drive`.
- Inventoried recently modified files and Git repositories under `C:\projects`.
- Read recent JSON activity records under `C:\Users\edsoe\My Drive\Personal Organization\JSON_Database\hrecords`.
- Read recent STT transcript `C:\Users\edsoe\My Drive\Personal Organization\Logs Calls Meeting STT\2026_06_08_06_43_23_1.txt`.
- Read selected project files and publication receipts in `C:\projects`.
- Queried Git logs across repositories under `C:\projects`.
- Used Google Drive connector searches for selected documents including Outdoor Brand Innovation Intelligence Report, PTC Innovation Directive, ALX PaiOS, Energy As Currency Via kWh, and Decentralized AI-Native Professional Networking.
## External State Changed
- Files created:
- `PID-update-review-draft-2026-06-16.md` in current workspace.
- `PID-update-run-receipt-2026-06-16.md` in current workspace.
- Files modified:
- `C:\projects\ES\eddie-soehnel-portable-identity-document-OPEN\skills\PID-update-maintenance-skill.md` was patched earlier in response to user correction.
- Cloud documents modified: none.
- PID changed: no.
- Nothing changed without explicit user approval: PID was not modified. Skill patch was made after user explicitly requested it and approved escalation.
## Approved Sources Reviewed
- `C:\Users\edsoe\My Drive`
- Recent file metadata.
- JSON activity records.
- One STT text transcript.
- Selected Google Drive docs through connector.
- `C:\projects`
- Recent file metadata.
- Selected Markdown task/workflow files.
- Selected publication receipts.
- Selected project strategy files.
- Git repository list and recent logs.
- Current PID file.
## Sources Skipped Or Unavailable
- Most `.gdoc`, `.gsheet`, and `.gslides` local stubs could not be read directly as content from disk; selected docs were fetched through Google Drive by title.
- Most PDFs were not deeply extracted due to time and relevance triage. Their filenames influenced source inventory; selected Drive-fetched PDF content appeared in connector results where available.
- Email/Gmail, calendar, browser history, NAS media, cloud backup exports, and CRM connectors were not separately reviewed because only local roots were explicitly listed, and no separate account/label/query scopes were provided.
- FIT files were inventoried but not parsed.
## Sources Not Authorized Or Intentionally Excluded
- Any source outside `C:\Users\edsoe\My Drive` and `C:\projects`.
- Private raw recipient lists, credentials, hostnames/IPs, account details, private health/family/legal/financial details were not included as proposed public PID text.
## Draft Created
`PID-update-review-draft-2026-06-16.md`
## User Review Status
Awaiting user review. User has not approved draft for PID insertion.
## PID Update Status
PID unchanged. Awaiting review and approval.
## Outputs Produced
- Review draft: `PID-update-review-draft-2026-06-16.md`
- Source map: source/evidence notes are embedded in the review draft rather than created as a separate file.
- Open questions: embedded in the review draft.
- Updated PID or copy-ready update: not produced yet.
- Run receipt: `PID-update-run-receipt-2026-06-16.md`
## Validation Results
- Current PID was read.
- PID structure was used rather than generic fallback.
- Review draft was created before any PID update.
- Every proposed addition is mapped to a PID section.
- Facts are labeled as facts and include evidence.
- Inferences are labeled as inferences.
- Questions are labeled as questions.
- Standard privacy was applied.
- PID was not modified before user review.
- Run receipt was created.
## Privacy Decisions
- Health/activity tracker details were mined only for professional/project signals and were not proposed as public health detail.
- Family, client, dog boarding, financial, legal, and private account details were either omitted or generalized.
- Edge infrastructure details were summarized at capability level, with a review note to avoid public exposure of hostnames, keys, IPs, and exact security posture.
- Email campaign details were summarized as workflow/proof of work, not recipient-level data.
## Notable Inferences
- A technical development partner may help accelerate NetworkSIG/PaddleNet.
- The user may be moving toward an AI integration / automation specialist positioning.
- Industry associations and niche communities may be strong match opportunities for innovation sprint/challenge formats.
- Publication receipts are high-quality proof artifacts for shipped/open-source work.
## Unsupported Or Low-Confidence Items Removed, Downgraded, Or Turned Into Questions
- AI dog-training / interpret-dog work was turned into a review question because the transcript suggested uncertainty and possible deprioritization.
- SIA proposal inclusion was marked for review because proposal/outreach status may be private or premature.
- Health/fitness signals were excluded from proposed public updates except broad outdoor/physical-practice implications.
- Exact infrastructure/security details were generalized.
## Failures Or Gaps Found
- Original skill language allowed ambiguity that led the agent to initially assume the PID repo might be the primary source. This was corrected before the source scan.
- Very broad source roots create large review surfaces; metadata-first triage was necessary.
- Local Google Drive stubs do not expose document content directly.
- Calendar/email/source connectors were not fully scoped by user, so they were not separately reviewed.
## Fixes Applied
- Patched `PID-update-maintenance-skill.md` to require explicit source locations/scopes and warn not to assume the PID repo or PID folder is an approved source.
- Used Google Drive connector for selected documents where local stubs were insufficient.
## Open Questions
- Should the PID publicly mention AI integration / automation consulting availability?
- Should the SIA proposal be included now?
- How specific should the public PID be about edge-compute infrastructure?
- Should health/fitness/activity signals remain entirely private?
- Should "Applied Knowledge & Recommendations" be added to Eddie's own PID?
- Should "Energy as Currency via kWh" become a named framework in the PID?
- Should LOD AI dog-training exploration be included or withheld?
## Ratchet Lessons
- Future runs should ask for exact source locations and not assume the PID repo as an activity source.
- Future runs should prioritize activity logs, receipts, task workflow docs, and Google Docs with relevant titles when broad roots are authorized.
- Future runs should treat Drive stubs as pointers and use Drive connectors where available.
- Future runs should treat publication receipts as proof-of-work evidence.
## Ratchet Artifacts Added Or Suggested
- Added directly to skill: explicit source listing requirement and validation rule against PID-folder source assumptions.
- Suggested in draft:
- source-priority heuristic
- Google Drive stub rule
- standard privacy default for activity trackers
- publication receipt signal category
- strategy proposal/outreach review flag
## Unresolved Risks
- Broad roots may contain sensitive material that was not deeply reviewed but could be accidentally surfaced in future runs without privacy rules.
- Some Google Docs and PDFs were not fully read.
- Some relevant email/calendar evidence may be missing because account/label/calendar scopes were not explicitly provided.
- Draft may overrepresent highly visible recent project clusters and underrepresent quieter relationship or calendar signals.
## Resume / Audit Notes
- How a future agent can continue: read `PID-update-review-draft-2026-06-16.md`, apply user edits, then append approved items into the matching PID sections.
- What should be reviewed first: open questions, privacy notes, SIA proposal inclusion, infrastructure specificity, and whether AI integration consulting positioning should be public.
## Recommended Next Steps
- User reviews and edits the draft.
- After approval, append approved additions to the existing PID sections rather than rewriting the whole PID.
- If user agrees, copy the draft and receipt into the PID repo / `skill-receipts` folder for durable storage.