This commit is contained in:
eddiesoehnel committed 2026-10-06 14:47:01 -06:00
commit 8313c5c6b5
84 files changed
+4337

No files matched your search

+22
View File
@@ -0,0 +1,22 @@
# Connector transition notes
This note is a generic design checklist for teams moving scheduling logic from a local prototype to provider-native connectors. It does not describe a live migration or prove that any provider action has occurred.
## Before a transition
- Identify the authoritative request path and the account identities allowed to act.
- Map each external read and write, including the evidence needed to verify its result.
- Define how transaction state is reconstructed after a restart or an uncertain response.
- Keep provider credentials and account-specific configuration outside source control.
- Test with synthetic data and a dedicated non-production account.
## During implementation
- Recheck availability immediately before booking.
- Persist provider IDs needed to reconcile writes; do not treat a local status label as proof of a completed external action.
- Fail closed when an action may have succeeded but cannot be verified.
- Separate provider-specific adapters from policy decisions so integrations can be reviewed independently.
## Limitations
This repository is a prototype and does not include a hosted runtime or account-specific connector configuration. Independent recovery, restart, and repeated-run behavior must be validated in the deployment where the software will operate. Do not infer production readiness from sample fixtures or a successful local run.